The Perl Toolchain Summit needs more sponsors. If your company depends on Perl, please support this very important event.
###########################################################################
#
# This file is partially auto-generated by the DateTime::Locale generator
# tools (v0.10). This code generator comes with the DateTime::Locale
# distribution in the tools/ directory, and is called generate-modules.
#
# This file was generated from the CLDR JSON locale data. See the LICENSE.cldr
# file included in this distribution for license details.
#
# Do not edit this file directly unless you are sure the part you are editing
# is not created by the generator.
#
###########################################################################


=pod

=encoding UTF-8

=head1 NAME

DateTime::Locale::pl_PL - Locale data examples for the pl-PL locale.

=head1 DESCRIPTION

This pod file contains examples of the locale data available for the
Polish Poland locale.

=head2 Days

=head3 Wide (format)

  poniedziałek
  wtorek
  środa
  czwartek
  piątek
  sobota
  niedziela

=head3 Abbreviated (format)

  pon.
  wt.
  śr.
  czw.
  pt.
  sob.
  niedz.

=head3 Narrow (format)

  P
  W
  Ś
  C
  P
  S
  N


=head3 Wide (stand-alone)

  poniedziałek
  wtorek
  środa
  czwartek
  piątek
  sobota
  niedziela

=head3 Abbreviated (stand-alone)

  pon.
  wt.
  śr.
  czw.
  pt.
  sob.
  niedz.

=head3 Narrow (stand-alone)

  P
  W
  Ś
  C
  P
  S
  N

=head2 Months

=head3 Wide (format)

  stycznia
  lutego
  marca
  kwietnia
  maja
  czerwca
  lipca
  sierpnia
  września
  października
  listopada
  grudnia

=head3 Abbreviated (format)

  sty
  lut
  mar
  kwi
  maj
  cze
  lip
  sie
  wrz
  paź
  lis
  gru

=head3 Narrow (format)

  s
  l
  m
  k
  m
  c
  l
  s
  w
  p
  l
  g


=head3 Wide (stand-alone)

  styczeń
  luty
  marzec
  kwiecień
  maj
  czerwiec
  lipiec
  sierpień
  wrzesień
  październik
  listopad
  grudzień

=head3 Abbreviated (stand-alone)

  sty
  lut
  mar
  kwi
  maj
  cze
  lip
  sie
  wrz
  paź
  lis
  gru

=head3 Narrow (stand-alone)

  s
  l
  m
  k
  m
  c
  l
  s
  w
  p
  l
  g

=head2 Quarters

=head3 Wide (format)

  I kwartał
  II kwartał
  III kwartał
  IV kwartał

=head3 Abbreviated (format)

  K1
  K2
  K3
  K4

=head3 Narrow (format)

  1
  2
  3
  4


=head3 Wide (stand-alone)

  I kwartał
  II kwartał
  III kwartał
  IV kwartał

=head3 Abbreviated (stand-alone)

  1 kw.
  2 kw.
  3 kw.
  4 kw.

=head3 Narrow (stand-alone)

  1
  2
  3
  4

=head2 Eras

=head3 Wide (format)

  p.n.e.
  n.e.

=head3 Abbreviated (format)

  p.n.e.
  n.e.

=head3 Narrow (format)

  p.n.e.
  n.e.

=head2 Date Formats

=head3 Full

   2008-02-05T18:30:30 = wtorek, 5 lutego 2008
   1995-12-22T09:05:02 = piątek, 22 grudnia 1995
  -0010-09-15T04:44:23 = sobota, 15 września -10

=head3 Long

   2008-02-05T18:30:30 = 5 lutego 2008
   1995-12-22T09:05:02 = 22 grudnia 1995
  -0010-09-15T04:44:23 = 15 września -10

=head3 Medium

   2008-02-05T18:30:30 = 05.02.2008
   1995-12-22T09:05:02 = 22.12.1995
  -0010-09-15T04:44:23 = 15.09.-10

=head3 Short

   2008-02-05T18:30:30 = 05.02.2008
   1995-12-22T09:05:02 = 22.12.1995
  -0010-09-15T04:44:23 = 15.09.-10


=head2 Time Formats

=head3 Full

   2008-02-05T18:30:30 = 18:30:30 UTC
   1995-12-22T09:05:02 = 09:05:02 UTC
  -0010-09-15T04:44:23 = 04:44:23 UTC

=head3 Long

   2008-02-05T18:30:30 = 18:30:30 UTC
   1995-12-22T09:05:02 = 09:05:02 UTC
  -0010-09-15T04:44:23 = 04:44:23 UTC

=head3 Medium

   2008-02-05T18:30:30 = 18:30:30
   1995-12-22T09:05:02 = 09:05:02
  -0010-09-15T04:44:23 = 04:44:23

=head3 Short

   2008-02-05T18:30:30 = 18:30
   1995-12-22T09:05:02 = 09:05
  -0010-09-15T04:44:23 = 04:44


=head2 Datetime Formats

=head3 Full

   2008-02-05T18:30:30 = wtorek, 5 lutego 2008 18:30:30 UTC
   1995-12-22T09:05:02 = piątek, 22 grudnia 1995 09:05:02 UTC
  -0010-09-15T04:44:23 = sobota, 15 września -10 04:44:23 UTC

=head3 Long

   2008-02-05T18:30:30 = 5 lutego 2008 18:30:30 UTC
   1995-12-22T09:05:02 = 22 grudnia 1995 09:05:02 UTC
  -0010-09-15T04:44:23 = 15 września -10 04:44:23 UTC

=head3 Medium

   2008-02-05T18:30:30 = 05.02.2008, 18:30:30
   1995-12-22T09:05:02 = 22.12.1995, 09:05:02
  -0010-09-15T04:44:23 = 15.09.-10, 04:44:23

=head3 Short

   2008-02-05T18:30:30 = 05.02.2008, 18:30
   1995-12-22T09:05:02 = 22.12.1995, 09:05
  -0010-09-15T04:44:23 = 15.09.-10, 04:44


=head2 Available Formats

=head3 E (ccc)

   2008-02-05T18:30:30 = wt.
   1995-12-22T09:05:02 = pt.
  -0010-09-15T04:44:23 = sob.

=head3 EHm (E, HH:mm)

   2008-02-05T18:30:30 = wt., 18:30
   1995-12-22T09:05:02 = pt., 09:05
  -0010-09-15T04:44:23 = sob., 04:44

=head3 EHms (E, HH:mm:ss)

   2008-02-05T18:30:30 = wt., 18:30:30
   1995-12-22T09:05:02 = pt., 09:05:02
  -0010-09-15T04:44:23 = sob., 04:44:23

=head3 Ed (E, d)

   2008-02-05T18:30:30 = wt., 5
   1995-12-22T09:05:02 = pt., 22
  -0010-09-15T04:44:23 = sob., 15

=head3 Ehm (E, h:mm a)

   2008-02-05T18:30:30 = wt., 6:30 PM
   1995-12-22T09:05:02 = pt., 9:05 AM
  -0010-09-15T04:44:23 = sob., 4:44 AM

=head3 Ehms (E, h:mm:ss a)

   2008-02-05T18:30:30 = wt., 6:30:30 PM
   1995-12-22T09:05:02 = pt., 9:05:02 AM
  -0010-09-15T04:44:23 = sob., 4:44:23 AM

=head3 Gy (y G)

   2008-02-05T18:30:30 = 2008 n.e.
   1995-12-22T09:05:02 = 1995 n.e.
  -0010-09-15T04:44:23 = -10 p.n.e.

=head3 GyMMM (MMM y G)

   2008-02-05T18:30:30 = lut 2008 n.e.
   1995-12-22T09:05:02 = gru 1995 n.e.
  -0010-09-15T04:44:23 = wrz -10 p.n.e.

=head3 GyMMMEd (E, d MMM y G)

   2008-02-05T18:30:30 = wt., 5 lut 2008 n.e.
   1995-12-22T09:05:02 = pt., 22 gru 1995 n.e.
  -0010-09-15T04:44:23 = sob., 15 wrz -10 p.n.e.

=head3 GyMMMM (LLLL y G)

   2008-02-05T18:30:30 = luty 2008 n.e.
   1995-12-22T09:05:02 = grudzień 1995 n.e.
  -0010-09-15T04:44:23 = wrzesień -10 p.n.e.

=head3 GyMMMMEd (E, d MMMM y G)

   2008-02-05T18:30:30 = wt., 5 lutego 2008 n.e.
   1995-12-22T09:05:02 = pt., 22 grudnia 1995 n.e.
  -0010-09-15T04:44:23 = sob., 15 września -10 p.n.e.

=head3 GyMMMMd (d MMMM y G)

   2008-02-05T18:30:30 = 5 lutego 2008 n.e.
   1995-12-22T09:05:02 = 22 grudnia 1995 n.e.
  -0010-09-15T04:44:23 = 15 września -10 p.n.e.

=head3 GyMMMd (d.MM.y G)

   2008-02-05T18:30:30 = 5.02.2008 n.e.
   1995-12-22T09:05:02 = 22.12.1995 n.e.
  -0010-09-15T04:44:23 = 15.09.-10 p.n.e.

=head3 H (HH)

   2008-02-05T18:30:30 = 18
   1995-12-22T09:05:02 = 09
  -0010-09-15T04:44:23 = 04

=head3 Hm (HH:mm)

   2008-02-05T18:30:30 = 18:30
   1995-12-22T09:05:02 = 09:05
  -0010-09-15T04:44:23 = 04:44

=head3 Hms (HH:mm:ss)

   2008-02-05T18:30:30 = 18:30:30
   1995-12-22T09:05:02 = 09:05:02
  -0010-09-15T04:44:23 = 04:44:23

=head3 Hmsv (HH:mm:ss v)

   2008-02-05T18:30:30 = 18:30:30 UTC
   1995-12-22T09:05:02 = 09:05:02 UTC
  -0010-09-15T04:44:23 = 04:44:23 UTC

=head3 Hmv (HH:mm v)

   2008-02-05T18:30:30 = 18:30 UTC
   1995-12-22T09:05:02 = 09:05 UTC
  -0010-09-15T04:44:23 = 04:44 UTC

=head3 M (L)

   2008-02-05T18:30:30 = 2
   1995-12-22T09:05:02 = 12
  -0010-09-15T04:44:23 = 9

=head3 MEd (E, d.MM)

   2008-02-05T18:30:30 = wt., 5.02
   1995-12-22T09:05:02 = pt., 22.12
  -0010-09-15T04:44:23 = sob., 15.09

=head3 MMM (LLL)

   2008-02-05T18:30:30 = lut
   1995-12-22T09:05:02 = gru
  -0010-09-15T04:44:23 = wrz

=head3 MMMEd (E, d.MM)

   2008-02-05T18:30:30 = wt., 5.02
   1995-12-22T09:05:02 = pt., 22.12
  -0010-09-15T04:44:23 = sob., 15.09

=head3 MMMMEd (E, d MMMM)

   2008-02-05T18:30:30 = wt., 5 lutego
   1995-12-22T09:05:02 = pt., 22 grudnia
  -0010-09-15T04:44:23 = sob., 15 września

=head3 MMMMd (d MMMM)

   2008-02-05T18:30:30 = 5 lutego
   1995-12-22T09:05:02 = 22 grudnia
  -0010-09-15T04:44:23 = 15 września

=head3 MMMd (d.MM)

   2008-02-05T18:30:30 = 5.02
   1995-12-22T09:05:02 = 22.12
  -0010-09-15T04:44:23 = 15.09

=head3 Md (d.MM)

   2008-02-05T18:30:30 = 5.02
   1995-12-22T09:05:02 = 22.12
  -0010-09-15T04:44:23 = 15.09

=head3 d (d)

   2008-02-05T18:30:30 = 5
   1995-12-22T09:05:02 = 22
  -0010-09-15T04:44:23 = 15

=head3 h (h a)

   2008-02-05T18:30:30 = 6 PM
   1995-12-22T09:05:02 = 9 AM
  -0010-09-15T04:44:23 = 4 AM

=head3 hm (h:mm a)

   2008-02-05T18:30:30 = 6:30 PM
   1995-12-22T09:05:02 = 9:05 AM
  -0010-09-15T04:44:23 = 4:44 AM

=head3 hms (h:mm:ss a)

   2008-02-05T18:30:30 = 6:30:30 PM
   1995-12-22T09:05:02 = 9:05:02 AM
  -0010-09-15T04:44:23 = 4:44:23 AM

=head3 hmsv (h:mm:ss a v)

   2008-02-05T18:30:30 = 6:30:30 PM UTC
   1995-12-22T09:05:02 = 9:05:02 AM UTC
  -0010-09-15T04:44:23 = 4:44:23 AM UTC

=head3 hmv (h:mm a v)

   2008-02-05T18:30:30 = 6:30 PM UTC
   1995-12-22T09:05:02 = 9:05 AM UTC
  -0010-09-15T04:44:23 = 4:44 AM UTC

=head3 ms (mm:ss)

   2008-02-05T18:30:30 = 30:30
   1995-12-22T09:05:02 = 05:02
  -0010-09-15T04:44:23 = 44:23

=head3 y (y)

   2008-02-05T18:30:30 = 2008
   1995-12-22T09:05:02 = 1995
  -0010-09-15T04:44:23 = -10

=head3 yM (MM.y)

   2008-02-05T18:30:30 = 02.2008
   1995-12-22T09:05:02 = 12.1995
  -0010-09-15T04:44:23 = 09.-10

=head3 yMEd (E, d.MM.y)

   2008-02-05T18:30:30 = wt., 5.02.2008
   1995-12-22T09:05:02 = pt., 22.12.1995
  -0010-09-15T04:44:23 = sob., 15.09.-10

=head3 yMMM (MM.y)

   2008-02-05T18:30:30 = 02.2008
   1995-12-22T09:05:02 = 12.1995
  -0010-09-15T04:44:23 = 09.-10

=head3 yMMMEd (E, d.MM.y)

   2008-02-05T18:30:30 = wt., 5.02.2008
   1995-12-22T09:05:02 = pt., 22.12.1995
  -0010-09-15T04:44:23 = sob., 15.09.-10

=head3 yMMMM (LLLL y)

   2008-02-05T18:30:30 = luty 2008
   1995-12-22T09:05:02 = grudzień 1995
  -0010-09-15T04:44:23 = wrzesień -10

=head3 yMMMMEd (E, d MMMM y)

   2008-02-05T18:30:30 = wt., 5 lutego 2008
   1995-12-22T09:05:02 = pt., 22 grudnia 1995
  -0010-09-15T04:44:23 = sob., 15 września -10

=head3 yMMMMd (d MMMM y)

   2008-02-05T18:30:30 = 5 lutego 2008
   1995-12-22T09:05:02 = 22 grudnia 1995
  -0010-09-15T04:44:23 = 15 września -10

=head3 yMMMd (d.MM.y)

   2008-02-05T18:30:30 = 5.02.2008
   1995-12-22T09:05:02 = 22.12.1995
  -0010-09-15T04:44:23 = 15.09.-10

=head3 yMd (d.MM.y)

   2008-02-05T18:30:30 = 5.02.2008
   1995-12-22T09:05:02 = 22.12.1995
  -0010-09-15T04:44:23 = 15.09.-10

=head3 yQQQ (QQQ y)

   2008-02-05T18:30:30 = K1 2008
   1995-12-22T09:05:02 = K4 1995
  -0010-09-15T04:44:23 = K3 -10

=head3 yQQQQ (QQQQ y)

   2008-02-05T18:30:30 = I kwartał 2008
   1995-12-22T09:05:02 = IV kwartał 1995
  -0010-09-15T04:44:23 = III kwartał -10


=head2 Miscellaneous

=head3 Prefers 24 hour time?

Yes

=head3 Local first day of the week

1 (poniedziałek)

=head1 SUPPORT

See L<DateTime::Locale>.

=cut